Our Projects

Government of Karnataka, through HESCOM Tr(HubliElectricitySupply Company):

It is implementing key infrastructure upgrades to improve power reliability. This includes the Ganjan Kalyan Reconductoring Project, along with the strengthening of 33 kV and 11 kV lines. UNIP works are being carried out to enhance safety and reduce outages, especially in urban areas. Additionally, the installation of GOS (GangOperated Switches) and AB Switches enables better control and faster fault isolationacross thepowernetwork.

Solar Project:

It is being developed to support efficient energy transmission. The project includes the construction of a 33 kV transmission line spanning 35 kilometers and an 11 kV distribution line covering 120 kilometers. Additionally, the installationofvarious switchingequipment isbeing carried out to ensure safe and reliable operation of the power system, enabling smooth integration of solarenergyintothegrid.

NHAI (National Highways Authority of India):

Road development projects, including essential line shifting works, are being undertaken to clear the right-of-way (RoW) for highway expansion. This includes the relocation of electric poles and the reinstallation of overhead lines using ACSR/AAAC conductors. The work ensures an uninterrupted power supply while maintaining safety and compliance with utility standards during and after road construction.

Station Work:

Executed 11kV, 33kV, and 110kV substation installations near Bijapur, including transmission tower erection, transformers, switchgear, cabling, and protection system integration, ensuring safety, reliability, andtimelycompletion.

Windprojects:

Executed wind machine projects covering complete installation, assembly erection, and electrical cabling work. The work included site preparation, foundation laying, and structural assembly of turbine components. Nacelles and blades were mounted with precision, and all electrical systems, cabling, and control wiring were integrated. Strict adherence to safety standards and regulatory requirements was maintainedthroughout.

Water pipeline projects:

Executed water pipeline projects, including laying of pipelines and conducting hydrostatic tests to ensure leak-free, safe, and reliable water supply systems. All works were carried out with strict adherence to safety standards and timely project completion..
Scroll to Top